• +974 55665305
  • info@vilsafgs.com
  • Eighteeen Tower Zone 69, Street 303, Building 230, 8 th Floor, Office No:804 B Lusail

Shortened construction process

Allow the concrete slab to harden for 2 days. Then grind the slab smooth, removing the concrete skin which “opens” the concrete and allows the slab to dry faster. Once the grinding is finished, construction work can continue. As the slab is smooth from the grinding, no self-levelling compound is required. However, it must be watered and covered with plastic to avoid shrinkage cracks.

Option

Allow the concrete slab to harden while watering it under plastic for 7 days. Then grinding can commence and no more watering is required..

Advantages

- Significantly shorter construction time
- Lower costs
- Less edge work
- Fewer risks
- Environmentally-friendly construction process

The importance of a good casting

The smoothness of the concrete slab from the casting and the size of the grinding machine determine how fast the concrete slab can be finished.